Building a New Home Series: Tip #4

  • Sink in Utility Room – Make it as deep as possible. Plan before foundation is poured so plumbing and drains can be set.
  • Adding a Bathroom – Sometimes some floorplans just don’t work because they lack a needed bathroom. This addition needs to be known before the cement is poured. An added bath in a Formal area or Study area can be very important if you have a home based business or ever expect to convert this space to a bedroom.
This entry was posted in News. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>