Building a New Home Series: Tip # 6 (again)

  • Ice Maker Water Line to 2nd Refrigerator – This must be done before Foundation is poured.
  • Closes Dryer Gas Line – Complete during Frame Stage.
  • Gas and Electric Drops for Kitchen Cook-top – If located inIsland, this must be known by your contractor before the cement is poured.
This entry was posted in News. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>